Adapters - UTMC Compliant

All of Cloud Amber adaptors are integrated using the published UTMC standards and protocols. Whether a CORBA or SNMP connection is used, the Cloud Amber system is fully compliant to the standard and has already implemented all of the data objects.

Cloud Amber has designed our adaptor architecture for the specific purpose of integrating as many systems into UTMC as simply and effortlessly as possible without involving either large amounts of development time or overhead.

This has been achieved by implementing an adaptor architecture that is layered throughout the system. The system works by using core adaptor code that can be customised for each object type. End points are the developed and integrated in to the system to deal with the specific connection formats that different suppliers have. These end points simply create the UTMC data object programmatically with the core adaptor code taking care of the CORBA and common database SQL work.

Adaptor Architecture

It is for this reason, that once an adaptor has been developed it makes very little difference to Cloud Amber if a different provider of that product is selected. In other words, the end point for the same data type is simply and easily added in to the system with minimal fuss and development effort.

Successful Adaptors & End Points

The following table details where Cloud Amber has this library in place and working. 

End Point

Data Object

Sites Used

Total Controlling Objects

TIH

VMS

UK Voyager, Dorset, Cambridgeshire.

3,000

TIH

Roadwork

UK Voyager, Dorset, Cambridgeshire.

500 per day.

TIH

Events

UK Voyager, Dorset, Cambridgeshire.

500 per day.

TIH

Accident

UK Voyager, Dorset, Cambridgeshire.

500 per day.

Dambach PGS

VMS

Surrey, Cambridgeshire.

250

Dambach PGS

Car Park

Surrey, Cambridgeshire.

150

Quadrant

CCTV

Dorset.

36

Golden River

Detector

Dorset.

46

Met Office

Meteorological

SYITS.

15

Findlay Irvine

Meteorological

Dorset.

6

Prefect

Access Control

Bradford, Dorset.

100 faults per day.

Prefect

Air Quality

Bradford, Dorset.

100 faults per day.

Prefect

Car Park

Bradford, Dorset.

100 faults per day.

Prefect

Detector

Bradford, Dorset.

100 faults per day.

Prefect

Meteorological

Bradford, Dorset.

100 faults per day.

Prefect

Transport Link

Bradford, Dorset.

100 faults per day.

Prefect

Transport Route

Bradford, Dorset.

100 faults per day.

Prefect

Traffic Signal

Bradford, Dorset.

100 faults per day.

Prefect

VMS

Bradford, Dorset.

100 faults per day.

RTIG XML (ACIS & AIM)

Transport Link

Bournemouth, Dorset, SYITS.

3,000 vehicles, 28,000 bus stos.

RTIG XML (ACIS & AIM)

Transport Route

Bournemouth, Dorset, SYITS.

3,000 vehicles, 28,000 bus stos.

TPEG

Roadwork

UK Voyager, Dorset, Cambridgeshire, Bedfordshire, Surrey, SYITS, WYPTE.

500 per day.

TPEG

Incident

UK Voyager, Dorset, Cambridgeshire, Bedfordshire, Surrey, SYITS, WYPTE.

500 per day.

Symology

Roadwork

Bradford, SYITS, Dorset.

15,000

Exor

Roadwork

Hampshire.

5,000

Elgin

Roadwork

Bedfordshire, Cambridgeshire.

10,000

Bespoke Integration

Roadwork

Bradford.

2,000

Siemens RMS

Traffic Signal

Dorset, Cambridgeshire.

600

Kolara

Access Control

Cambridgeshire.

100 faults per day.

Kolara

Air Quality

Cambridgeshire.

100 faults per day.

Kolara

Car Park

Cambridgeshire.

100 faults per day.

Kolara

Detector

Cambridgeshire.

100 faults per day.

Kolara

Meterological

Cambridgeshire.

100 faults per day.

Kolara

Transport Link

Cambridgeshire.

100 faults per day.

Kolara

Transport Route

Cambridgeshire.

100 faults per day.

Kolara

Traffic Signal

Cambridgeshire.

100 faults per day.

Kolara

VMS

Cambridgeshire.

100 faults per day.



UTMC Adapter Software Development Kit

For suppliers and companies wanting to integrate in to UTMC systems, Cloud Amber has developed a Software Development Kit for integrating with UTMC systems. This product is described in more detail on our separate micro site UTMC Compliant Software Development Kit.

viaduct

Search Site